The kit logic

Three ideas do the work.

A kit is the unit of delivery between the factory and the frame: everything needed for a defined piece of the building, organized so the site spends its time assembling instead of sorting, measuring, and hunting.

NUMBERED

Every component has an identity

Each piece is numbered to the fabrication model and to the assembly documentation. The drawing says which numbered components form a wall or a floor section; the pieces on the ground carry the same numbers. No translation layer, no guesswork.

PRE-PUNCHED

Holes placed in the plant

Connection points and service pass-throughs are punched during manufacturing, where the model says they belong. Trades route through planned openings instead of negotiating with the frame after the fact.

SEQUENCED

Grouped by install order

Kits are organized around the assembly sequence — the components for the next step of the build are together, so the crew is not unpacking the whole project to find one wall.

From model to kit

How a kit comes to exist.

The model is the source

Kitting starts from the reviewed fabrication model (see plan conversion). The kit list is a read-out of the model, not a separate document that can drift from it.

Components are formed & punched

Roll-forming produces each component to its modeled dimensions, with its punches placed in the same operation.

Kits are assembled & checked

Components are grouped and numbered per the kit list before they are staged for delivery — completeness is a factory check, not a site discovery.

The site works the sequence

Delivery and assembly follow the same order the kits were built in. How that hand-off works is covered on the delivery & assembly page.

Assemble on site. Fabricate in the plant.
Honest limits

What kitting can and cannot do

Kitting moves work from the field to the factory, where conditions are controlled and repetition is cheap. What it cannot do is freeze a design that is still moving. A kit reflects the model at the time it is manufactured; a late design change can mean re-made components, and the cost and timing of that belong in the project conversation before anyone is surprised by them.

It also cannot assemble itself. Numbered components reward a crew that works from the assembly documentation — which is why the framing-crew conversation (who installs, with what support) matters as much as the kit itself. That is covered on the installation page.

And a kit is only as useful as its paperwork: keep the model drawings with the kits on site. If a component is damaged or missing, its number is what gets a replacement made — another reason the numbering discipline runs from model to plant to site without a break.

What if a piece arrives damaged or short?

Report it by its component number. Because every piece is a modeled object, a replacement can be manufactured to the same specification. Timing and terms for replacements are set in the project agreement — ask about them in the fit conversation.

Panels or loose components — which do I get?

Both forms exist in the system: components can arrive panelized or as numbered loose pieces, depending on the project, the systems in scope, and site conditions. The delivery form is a scope decision, made in the model review.

Do my electricians and plumbers need to do anything differently?

They route through pre-punched pass-throughs instead of drilling structure. The coordination win is real, but it has to be planned: MEP layouts that arrive after the model is frozen may not match the punched openings. Raise services early, in the conversion step.

Start with your project

Send the project details.

Same intake NexGen runs on its own site: who you are, and the parameters of the build. Plans can ride along right here.

About you

Who is the primary contact for this project?

Project details

Define the parameters of the build.

Project Timeline *
Purchasing Authority *

Upload a complete set of architectural plans for the engineering review. Architectural plans in PDF or CAD format only. Photos and screenshots can't be used. (max 100MB each)

This section mirrors the project form field for field. The button opens the secure hosted project form — the same fields — where your details and plans are actually submitted. Nothing typed on this page is sent from this page.

Project fit

Bring the plans. Start the comparison.

Send the plan set and the project details — the fit conversation works through scope, engineering, and the right next step for your building.