How the money works

Quoted from plans. Read the exclusions.

A model-based quote is only meaningful next to its scope definition and its exclusion list. Those three documents together are the price — any one of them alone is marketing.

QUOTING

Priced from the model, not a rate card

Your plans are converted and modeled (see plan conversion); quantities and components come from that model, and the quote is built on them for the scope you selected. That is why there is no honest per-project number before plans exist — and why ballparks offered without plans deserve skepticism, whoever offers them.

EXCLUSIONS

Scope lines, not fine print

Exclusions define what the quote is *not*: typically the work owned by other trades and systems — foundations, MEP, finishes — plus items like permits, fees, and freight where the agreement places them elsewhere. Read them as the boundary of the deal. A short exclusion list with a matching scope is a better sign than a vague quote with none.

WARRANTIES

In writing, in the agreement

Material and workmanship coverage, what it attaches to, and how a claim gets made are agreement terms. This page will not summarize them into a slogan — ask for the written warranty terms during the fit process and keep them with the signed quote, where they belong.

Territory

Where projects can be served.

Facilities per Jared Rothenberger's October update to partners. Freight distance from the serving plant is a real project factor — in cost, in schedule, and in delivery planning — which is why the map matters and why it keeps changing.

Live now

  • Linden, Utah
  • Pearl River, Louisiana
  • Boston, Massachusetts

Projects are served from the plant that fits the project's location and the current production queue — confirmed per project.

Coming in 2026

  • Sparks, Nevada — expected within roughly 45 days of the October update
  • Southern Arizona — November / early December
  • Fort Worth, Texas — production expected in January

Further expansion is planned for 2027 — ten additional facilities, with the Nashville area expected first (February). Plans, not promises: opening dates move, and the fit conversation works from the current map.

The quote, the scope, and the exclusions are one document
Comparing honestly

What actually drives a project's cost

Four drivers, all visible before anyone signs. Scope: which of the wall, truss, and floor systems are in — the subject of the scope page. Complexity: geometry, openings, and special conditions the model has to solve. Distance: freight from the serving facility to your site. Change: design movement after the model is set re-opens modeling, engineering, and possibly manufacturing — the most controllable cost on the list, and the one most often spent carelessly.

When you compare a NexGen quote against a conventional framing number, compare whole scopes: material, labor, waste handling, schedule effects, and the exclusions on both sides. A framing comparison that lines up only the material lines is how projects buy surprises. The fit conversation is built for exactly that whole-scope comparison — bring the numbers you already have, and expect the same directness back, including where the steel system is *not* the right economic answer for a given building.

And if your project sits far from a live plant today, say so early. A project that fits the 2026 map may be a strong fit on a different timeline — and a straight answer about territory now is worth more than an optimistic one that collapses at delivery planning.

Can I get a ballpark before sending plans?

Not a responsible one. The quoting basis is your modeled building; without plans there is nothing to model. The fit conversation can still happen first — it maps scope, territory, and whether conversion is worth your time.

What happens to my quote if the design changes?

The affected parts of the model are revised and the quote is re-issued against the revision, with the delta visible. Changes before manufacturing are paperwork; changes after components are formed are material. Timing of changes is a cost decision — treat it as one.

Is freight included?

Freight treatment is a quote and agreement line — included, excluded, or structured by delivery phase — and it depends on the serving plant and the delivery plan. Confirm it on your quote, in writing, alongside the other exclusions.

Start with your project

Send the project details.

The project intake, field for field: who you are, and the parameters of the build. Submitting continues to the secure hosted project form, where the details and plans are received.

About you

Who is the primary contact for this project?

Project details

Define the parameters of the build.

Project Timeline *
Purchasing Authority *

Upload a complete set of architectural plans for the engineering review. Architectural plans in PDF or CAD format only. Photos and screenshots can't be used. (max 100MB each) — the upload itself happens on the hosted project form, in the next step.

This section mirrors the project form field for field. The button opens the secure hosted project form — the same fields — where your details and plans are actually submitted. Nothing typed on this page is sent from this page.

Project fit

Bring the plans. Start the comparison.

Send the plan set and the project details — the fit conversation works through scope, engineering, and the right next step for your building.