Who installs

Three honest arrangements.

All three are in use somewhere; the right one depends on your crew's experience with steel, your schedule pressure, and the project. The fit conversation picks deliberately — and the agreement records the pick.

YOUR CREW

Self-perform

Your framing crew assembles from the model documentation and the numbered kits. Carpentry skill translates — the discipline changes: components are placed and connected, not measured and cut. First projects deserve a slower first assembly and full use of the documentation.

PARTNER CREW

A framing-crew partner

Crews who work in the system take the install, the way the framing-crews audience on this site describes. Availability is territory-dependent — a real question for the fit conversation, not an assumption.

SUPPORTED

Your crew, with support

The middle path many first projects take: your people install, with system guidance close at hand — documentation discipline, sequencing advice, and help structured into the project. What support is included is an agreement line, spelled out like any other.

The responsibility split

Named before the first delivery.

Decide who installs

Crew choice drives training, support, equipment, and the schedule conversation. Decide it in the fit review — not when the truck is booked.

Prepare the crew

Model documentation becomes the crew's working drawings: numbering, connections, sequence. A short orientation to the system beats a long day of improvisation.

Pass the readiness gate

Foundation verified, access and staging ready, inspections planned (see code & permitting). Kits arriving to a ready site is the whole ballgame — see delivery & assembly.

Assemble & verify

Assemblies go up in sequence and get checked against the model as they rise — plumb, level, anchorage, connections — while corrections are still cheap.

The crew assembles. The plant fabricated.
Timing, without the fairy tale

What the timeline actually depends on

The install clock has four gears, and only one of them is the assembly itself. Model freeze: manufacturing cannot start on a moving design. Manufacturing and delivery: the serving facility's queue and the freight run — real lead times, confirmed per project. Site readiness: a foundation or an inspection that slips, slips the frame. The crew: scope, crew size, and system experience set the assembly pace; a crew's first steel project is a learning project, and planning it as anything else is how schedules die.

What the system genuinely changes is the *shape* of the work: fabrication risk moves off the site and into a controlled plant, and on-site time concentrates on assembly — sequenced, documented, inspectable. Whether that nets out faster on *your* project is a comparison the fit review can make against your actual building and your actual crew — which is why this page gives you the gears instead of a number.

Responsibility follows the same principle: whoever installs owns the installation quality; the system side owns the components matching the model. Punch items, damage, and shortfalls get reported by component number and resolved under the project agreement's terms — another line to read before you sign, not after.

Do my carpenters need steel experience?

Framing skill carries over; the workflow changes more than the skills. Crews new to the system should plan orientation and a measured pace on the first assemblies. Ask in the fit conversation what training and documentation support a first project includes.

Who supplies fasteners and connection hardware?

Connection requirements come from the system engineering; who supplies which hardware is a scope line in the project agreement. Confirm it there — it is a small line that causes outsized site delays when it is assumed instead of written.

What if my project falls between territories for a partner crew?

Then self-perform or the supported arrangement may be the realistic path — territory coverage is on the cost & territory page, and the fit conversation works with the map as it actually is.

Start with your project

Send the project details.

The project intake, field for field: who you are, and the parameters of the build. Submitting continues to the secure hosted project form, where the details and plans are received.

About you

Who is the primary contact for this project?

Project details

Define the parameters of the build.

Project Timeline *
Purchasing Authority *

Upload a complete set of architectural plans for the engineering review. Architectural plans in PDF or CAD format only. Photos and screenshots can't be used. (max 100MB each) — the upload itself happens on the hosted project form, in the next step.

This section mirrors the project form field for field. The button opens the secure hosted project form — the same fields — where your details and plans are actually submitted. Nothing typed on this page is sent from this page.

Project fit

Bring the plans. Start the comparison.

Send the plan set and the project details — the fit conversation works through scope, engineering, and the right next step for your building.