Two scopes, one building

System engineering vs. project engineering.

The cleanest way to think about it: NexGen's side engineers the framing system itself; your project's design team remains responsible for the building as a whole. The line between them is a project deliverable — drawn explicitly, per project.

SYSTEM SIDE

Engineering of the components

The framing components — studs, panels, trusses, floors, and their connections — are engineered as a system against the project's design criteria: the loads, spans, and conditions your building presents. That engineering is what the fabrication model is built on.

PROJECT SIDE

Your engineer of record

The engineer of record owns the overall structure: foundations, the load path as a whole, and how the framing system interfaces with everything that is not the framing system. That role does not disappear because the framing is manufactured.

APPROVALS

Review is the AHJ's

Approvals belong to the authority having jurisdiction. Good documentation makes review faster and cleaner; nothing on this site can promise a reviewer's outcome, and any proposal that does should worry you.

How it runs

From criteria to approved documents.

Design criteria come in

The project supplies the governing criteria — code edition, site loads, building configuration — through the design team. Garbage criteria in, garbage engineering out; this step gets real attention.

The system is engineered & modeled

Components and connections are engineered, then detailed in the fabrication model (see plan conversion). Engineering and modeling check each other.

Responsibility is documented

Who engineered what, who reviews what, and what documentation goes to the building department is written down — before manufacturing, not during a plan-review comment cycle.

Review & revisions

Plan review comments are worked like any project's: answered, revised where needed, resubmitted. Changes to design criteria mid-stream re-open the affected engineering — plan for that honestly in the schedule.

Responsibility, named in writing
The questions to ask

Confirm it before you price it

Three questions separate a serious framing proposal from a brochure. Who is the engineer of record for this building? If the answer is fuzzy, stop there. What engineering documentation will I hold in my hands? — the component engineering, the model documentation, and whatever the jurisdiction requires for review should be listed deliverables, not vibes. Who responds to plan-review comments about the framing? That name should be in the agreement, because comments will come and the schedule will feel them.

Stamps and seals deserve the same plainness. Which documents carry whose seal is a function of the project's structure and the jurisdiction's rules; it is confirmed per project, in writing, as part of the fit process. This page deliberately does not promise a stamp configuration — the right one depends on your building, your team, and your building department, and pretending otherwise would be exactly the kind of claim the confirm list exists to catch.

Does NexGen stamp the drawings?

Stamping arrangements are project- and jurisdiction-specific. The fit conversation establishes which documents are sealed by whom for your project, and that gets recorded in the project agreement — ask for it there, in those words.

Can my own structural engineer handle the system engineering?

That is a scope conversation: some projects structure engineering differently. What matters is that the division is explicit and the component engineering matches the manufactured system. Raise it early — it affects documentation, review, and price.

What about special inspections?

Where the code or the jurisdiction requires special inspection of framing work, it is planned like any other inspection — scheduled against the install sequence. Your project's requirements come from its code analysis, covered next on the code & permitting page.

Start with your project

Send the project details.

The project intake, field for field: who you are, and the parameters of the build. Submitting continues to the secure hosted project form, where the details and plans are received.

About you

Who is the primary contact for this project?

Project details

Define the parameters of the build.

Project Timeline *
Purchasing Authority *

Upload a complete set of architectural plans for the engineering review. Architectural plans in PDF or CAD format only. Photos and screenshots can't be used. (max 100MB each) — the upload itself happens on the hosted project form, in the next step.

This section mirrors the project form field for field. The button opens the secure hosted project form — the same fields — where your details and plans are actually submitted. Nothing typed on this page is sent from this page.

Project fit

Bring the plans. Start the comparison.

Send the plan set and the project details — the fit conversation works through scope, engineering, and the right next step for your building.